Concrete slab
Measure rectangular areas and add them together.

Calculate concrete slab and post-hole volume, then convert your required volume to bags using a product yield you can verify.

Measure rectangular areas and add them together.

Subtract the post from the hole volume.

Turn volume and product yield into bag counts.

Start with the job you are measuring. Keep its dimensions and assumptions together.

Estimate a rectangular patio pour with a visible measurement diagram, chosen allowance and product-specific bag conversion.

Calculate the concrete volume for a specified shed-base footprint without treating the example depth as a construction recommendation.

Estimate concrete for separate path rectangles with different widths, keeping gaps and overlaps out of the total.

Combine compatible slab quantities before whole-bag rounding, or keep separate purchases explicit when the project needs them.

Plan concrete for groups of post holes with different dimensions, subtract round posts and combine unrounded material requirements.

Use a concrete bag’s stated mixed yield to calculate whole bags. See manufacturer-specific yield examples, a checked 1 cubic yard calculation and common unit mistakes.
Follow each quantity from the measured space to the amount you order.
Measure each section and choose its units. Keep separate areas and openings explicit.
Calculate the measured volume first. Subtract any supported displacement before adding an allowance.
Enter an allowance that suits your job. See it separately from the net quantity.
Use your product's yield or capacity. Round up whole packs only after the required quantity is known.

Compare bagged and bulk material quantities without assuming prices, delivery terms, package capacities or a universal density.
Read the guide
Understand rectangular material volume, mixed-unit conversion and multi-section totals with a formula you can check.
Read the guideA slab is calculated from length, width and depth. A cylindrical hole uses its radius and depth; a post occupying part of the hole is deducted. For a project with several areas, keep each set of dimensions so the total remains easy to check.
The size of a hole or slab tells you its volume. It does not tell you how much mixed concrete a particular bag will produce. Enter the yield from your selected product when you want a bag count.
PackLedge calculates quantities from dimensions you supply. It does not select slab thickness, hole depth, reinforcement or structural capacity. A worked patio or shed-base example explains the arithmetic, not a construction specification.
Original derivations using geometry, ratios, sums and whole-package rounding. Each calculator explains its assumptions and worked examples.
The source for the coverage, mixed yield, density, package capacity, sheet dimensions or wallpaper repeat that you enter.